Looking to remodel your kitchen, but not sure how long the renovation will take? Many homeowners don’t realize that a full remodel often means 6–12 weeks without a functional kitchen.
A full remodel often stretches across several months due to planning, permits, contractor scheduling, and construction. However, cabinet refacing is an alternative that can save both time and money while still dramatically updating the look of your kitchen.
At Redo Cabinets, we have over 70 years of experience in kitchen remodeling and cabinet refacing across the Milwaukee metro and Chicagoland area. In this guide, we’ll answer, “How long does a kitchen remodel take?” so you can make the best decision for your home.
What a Full Kitchen Remodel Involves
A kitchen remodel can range from a simple cosmetic update to a complete structural renovation. Some homeowners refresh their space with new cabinet doors, countertops, and fixtures, while others reconfigure the layout, move plumbing, upgrade electrical systems, and remove walls.
So, how long does a kitchen remodel take? The answer depends on the scope of work.
| What’s Included | Typical Timeline | Permit Needed? | |
|---|---|---|---|
| Cosmetic Refresh | Cabinet updates, hardware, paint, fixtures, and flooring | 4–8 weeks | Usually no |
| Mid-Range Remodel | New cabinets, countertops, appliances, backsplash | 6–12 weeks | Sometimes |
| Full Gut Remodel | Demo, layout changes, plumbing, electrical, and structural work | 12–16+ weeks | Yes |
The 5 Phases Every Full Remodel Goes Through
No matter the size of the project, most kitchen remodels follow the same general sequence.
1. Demolition and Disposal (1–3 Days)
2. Rough-In Work – Plumbing, Electrical, or HVAC if Needed (1–2 Weeks)
3. Drywall and Subfloor Repairs (3–5 Days)
4. Cabinet and Countertop Installation (1–2 Weeks)
5. Finish Work—Flooring, Backsplash, Fixtures, Paint (1–2 Weeks)
Why Permits Add Weeks Before Work Even Starts
Permits can also add time. In Wisconsin, kitchen projects that involve plumbing, electrical, or structural changes usually need approval before work begins. This can add 2–4 weeks before construction starts.
Cosmetic projects are different. Since no structural, plumbing, or electrical changes are involved, permits are often unnecessary. This is why cabinet refacing can be completed in days rather than weeks or months.
Variables That Change the Remodel Timeline
How long does it take to remodel a kitchen? If you’ve received multiple contractor estimates, you’ve probably noticed that timeline projections can vary quite a bit. That’s because several factors affect how long a kitchen remodel takes.
- Kitchen Size: A small kitchen can often be remodeled in 4–6 weeks, especially if the layout stays the same. Larger kitchens typically require more materials and labor, which can push timelines to 12 weeks or longer. Older Milwaukee-area homes may also have hidden plumbing or electrical issues that add time.
- Contractor Availability: Remodeling demand is often highest between spring and late summer in the Milwaukee area. During peak season, it may take several weeks to secure a project start date.
- Material Lead Times: Semi-custom cabinets can take 8–12 weeks to arrive after ordering. Quartz and granite countertops typically require an additional 10–14 days for measuring, fabrication, and installation after cabinets are in place.
Even with careful planning, delays can happen. Understanding these factors can help you set realistic expectations and avoid surprises during your remodel.
How a 2–4 Month Remodel Timeline Disrupts Real Life
Homeowners asking, “How long does a kitchen remodel take?” are often just as concerned about the disruption as they are about the cost.
During a full remodel, it’s common to lose access to your sink, stove, dishwasher, and food prep space for weeks to months. This can cause food costs to go up dramatically. Plus, construction noise, dust, and contractors coming and going can be especially disruptive for families with young children or those working from home.
That’s why many Milwaukee homeowners consider cabinet refacing instead. Refacing can dramatically update the look of a kitchen in just days, not weeks, while allowing you to maintain much of your normal routine.
The Alternative: What a 3–5-Day Timeline Looks Like
Cabinet refacing offers a much faster alternative to a full remodel. Instead of removing the entire cabinet system, refacing updates the existing surfaces, including doors, drawer fronts, and exterior finishes.
So, how long does cabinet refacing take? Because no plumbing, electrical, or structural work is involved, most projects can be completed in just 3–5 days. Your kitchen also remains partially functional throughout the process, with access to the sink and refrigerator typically maintained.
Common Mistakes That Push Kitchen Remodel Timelines Even Longer
Even the best remodeling plan can run into delays. These are some of the most common issues that extend kitchen remodel timelines.
- Making Design Changes Mid-Project: Changing cabinet styles, countertops, hardware, or finishes after materials are ordered can add weeks to a project. Finalizing selections before work begins helps keep everything on schedule.
- Unexpected Problems Behind the Walls: Older Milwaukee-area homes often have hidden issues such as outdated wiring, aging plumbing, or water damage. Discovering these problems during demolition usually means additional repairs before work can continue.
- Choosing a Contractor Who Is Overbooked: A contractor managing too many projects at once may struggle to stay on schedule. Delayed communication, shifting start dates, and gaps between work phases can quickly add time to a remodel.
If timeline and budget are your biggest concerns, it’s worth comparing the cost of cabinet refacing vs. a full remodel. For kitchens with solid cabinet boxes and a functional layout, refacing can deliver a dramatic update without months of construction.
Speak to an Expert About Your Kitchen Remodel Project Today
If you’re ready to refresh or modernize your kitchen but are still wondering, “How long does a kitchen remodel take?” our team at Redo Cabinets is here to help.
For over 70 years, we’ve delivered premium kitchen remodeling and cabinet refacing services for Chicagoland and Wisconsin homeowners. We’ll walk you through your options and expected timelines and help you choose the solution that best fits your goals, budget, and schedule.
Browse our gallery to see how cabinet refacing could be the right alternative to a full remodel for your home.
Frequently Asked Questions
How long does a kitchen remodel take on average?
Most kitchen remodels take 6–12 weeks or longer, depending on project scope, contractor availability, permits, and material lead times. From the first consultation to project completion, homeowners should expect the process to take several months. Cabinet refacing, on the other hand, takes an average of 3-5 days.
Can a kitchen remodel be done in 2 weeks?
A full structural remodel cannot realistically be completed in 2 weeks, as cabinet lead times alone are 8–12 weeks. However, cabinet refacing can transform a kitchen’s appearance in 3–5 days with no permits required.
How long does a small kitchen remodel take?
A small kitchen remodel is often completed in 4–6 weeks if the layout remains the same and no major plumbing or electrical work is needed. Larger or more complex projects typically take longer.
What part of a kitchen remodel takes the longest?
Cabinet ordering and installation are often the biggest timeline drivers. Semi-custom cabinets can take 8–12 weeks to arrive, while countertop fabrication can add another 10–14 days after measurements are complete.
Do I need a permit for a kitchen remodel in Milwaukee?
Permits are typically required when a project involves plumbing, electrical, or structural changes. Cosmetic updates that keep the existing layout intact may not require permits.